Precisely why a stretch of motorway needed to be shut by police for 30 hours

Editorial Team
3 Min Read


Three HGVs, two vans and 4 vehicles have been obliterated within the main collision

The scene of the crash(Picture: Nationwide Highways)

Nationwide Highways has defined why a part of the M60 wanted to be absolutely closed for 30 hours after a horror crash involving three lorries on Monday morning. Emergency providers responded to the incident at junction 27 in Portwood, Stockport, at 11.26am after the main collision involving three lorries, two vans and 4 vehicles.

One HGV smashed via the central reservation, with one other shedding beer barrels. Vehicles have been written off as particles and oil exploded over the carriageway. A full closure was initially put in place, with Nationwide Highways officers, police, hearth crews and paramedics closing the motorway in each instructions.

The incident resulted in main delays and congestion spilling out into close by Stockport and Tameside, and the highway block on either side remained in place for 26 hours.

It was not till round 1.45pm on Tuesday when highways officers have been lastly capable of reopen the anticlockwise carriageway, with one lane closed because of barrier injury.

Then after round 30 hours, the clockwise carriageway then absolutely reopened to visitors, with miles of delays taking a while to clear.

A closure of two lanes on either side was additionally put in place in a single day, into Wednesday for additional repairs to be carried out.

The incident befell on M60(Picture: Nationwide Highways)

Nationwide Highways mentioned: “A prolonged clear-up and restore operation has continued in a single day and in the present day (July 8) with Nationwide Highways working onerous to reopen the motorway in each instructions.

“Important injury was brought on within the collision and complicated infrastructure repairs have been required, together with changing a big part of central reservation barrier and endeavor repairs to a broken bridge parapet.

“Each carriageways wanted resurfacing following a big diesel spillage throughout all lanes. Lampposts broken within the collision additionally wanted to be remoted from the electrical energy provide and eliminated.

“As these repairs are steadily accomplished it has been potential to reopen two lanes of the M60 anticlockwise between Junction 1 (Stockport) and Junction 25 (Bredbury). Lane 3 of three will stay closed for security causes as additional repairs proceed.”

No severe accidents have been reported within the incident, with three individuals taken to Stepping Hill Hospital as a precaution for minor accidents.

Better Manchester Police is now interesting for dashcam footage and witness accounts of the incident.

Get every day breaking information updates in your telephone by becoming a member of our WhatsApp group right here. We often deal with members to particular affords, promotions and adverts from us and our companions. See our Privateness Discover.

Share This Article